Fully Fully Loaded with the exception of the heated steering wheel - I'm from Toronto but spend 5.5 months (November to April) in sunny Florida.
Build date is the 1st 10 days of March and this should perfectly coincide with my arrival back in Toronto on April 7th
Polar White